Why Industry Leaders Choose PIP

At Payal Industrial Park, every element is purposefully designed to serve industrial intent. From integrated utility corridors to comprehensive regulatory support, PIP is built to help chemical and allied industries overcome critical setup challenges—enabling faster execution, seamless integration, and long-term operational efficiency.

Positioned for Performance. Connected for Scale.

Positioned within Dahej PCPIR—India’s leading chemical manufacturing hub—PIP offers unmatched multimodal connectivity. Whether by sea, road, rail or air, every link is designed to reduce logistical friction and accelerate your route to market.

Gateway to Global Trade

Smooth access to Dahej Port and key maritime routes streamlines your import-export operations with global efficiency.

On Track with National Rail Links

Well-connected rail lines offer a cost-effective, reliable option for domestic freight and long-haul distribution.

Roads That Drive Results

Seamless highway access ensures swift movement of goods and materials across industrial corridors and consumption hubs.

Closer to the Sky

Strategically located domestic and international airports enable swift executive travel and efficient air cargo movement.

PIP

Mundra - 555 km
Kandla - 501 km
Hazira - 136km
Dahej - 25km
Bharuch Railway
Station - 35 kms
Vadodara - 120 km
Mumbai - 320 km
Surat - 129 km
Ahmedabad - 196 km
NH48 - 59 km
Dahej Bharuch
6 lane State
Highway - 10 kms
Vadodara - 120 km
Mumbai - 320 km
Surat - 129 km
Ahmedabad - 196 km

Phase 1 Now Live:

Built for Speed and Scale

Robust, future-ready infrastructure designed to accelerate execution and ensure operational continuity.

Seamless Connectivity – Roads That Drive Efficiency

Wide, well-paved internal roads ensure smooth vehicular movement across the park, built to accommodate heavy industrial traffic and logistics operations with ease.

CETP – Zero-Discharge, Compliant, Scalable

Wide, well-paved internal roads ensure smooth vehicular movement across the park, built to accommodate heavy industrial traffic and logistics operations with ease.

 66 KV Substation – Reliable Power Backbone

A pre-approved 66 KV substation within the park ensures uninterrupted industrial-grade power supply, eliminating the need for individual infrastructure investment and enabling faster power connectivity.

On-Site Health Centre – Safety Meets Accessibility

A fully-equipped health centre ensures immediate medical assistance for employees, contributing to workplace safety and well-being as part of PIP’s commitment to holistic support.

Pocket Parks – Where Industry Meets Wellness

Thoughtfully curated green spaces foster a sense of balance within the industrial ecosystem:

  • Community Park: A shared green zone for recreation and networking.
  • Sensory Park: Designed to promote mindfulness and cognitive rejuvenation.
  • Oxygen Park: A green lung within the park, enhancing air quality and aesthetics.

Utility Corridor – Access at Your Doorstep

Integrated utility corridors provide ready access to power, water, gas, and effluent lines—ensuring a plug-and-play setup for every industrial unit.

 Ikshana Clubhouse – Business, Leisure, and Beyond

An exclusive space for industry leaders to unwind, connect, and collaborate. With curated amenities, the Ikshana Clubhouse reflects the premium lifestyle that complements a world-class industrial facility.

Executive Housing – Designed for Industrial Leadership

Premium residential facilities within the park cater to CXOs and senior leadership, offering convenience, comfort, and strategic proximity to their operations.

Plug & Play Infrastructure Delivered to Your Doorstep

From the outset, PIP delivers critical industrial infrastructure that is dependable, cohesive, and built for execution. Every utility is pre-installed to reduce setup costs, eliminate delays and maximise operational efficiency.

Environmental Clearance

Approvals Secured For Growth

Pre-cleared land with Red (A) category sanction—free from title risk, compliance hurdles, or legal ambiguity.

Power

Energy That’s Always On

Substation within the park and trench-ready infrastructure ensure uninterrupted, scalable power access.

Gas

Fueling You From Day One

Direct gas connectivity by Gujarat Gas to every plot, ensuring operational readiness without delays.

92 MLD Water

Energy That’s Always On

Supplied by GIDC with a robust distribution network designed for high-volume industrial usage

CETP

Compliance Built In

Centralised treatment with MoEFCC approval, deep-sea discharge, and generous inlet norms — ready from Phase 1.
Know more about CETP

Streamlined Onboarding Process

From initial inquiry to operational execution, every step is thoughtfully structured, fully supported and seamlessly streamlined, allowing you to focus on building your business instead of battling bureaucracy.

Initial Inquiry & Assessment

Start with Strategic Clarity

Understanding your business needs and identifying the most suitable land options.

CIFA Agreement

Infrastructure Terms Made Simple

Execution of the Common Infrastructure Facilities Agreement that outlines shared responsibilities, charges, and access rights.

Land Acquisition

Secure Land with Complete Confidence

Secure the identified plot with full legal clearance and perpetual title indemnification.

Regulatory Approvals

Approvals Without the Hassle

Facilitated support for all mandatory clearances—environmental, building plans, utilities, and more.

Construction

Setup That Starts Smoothly

Assistance with building plan approvals, infrastructure connection, and on-ground setup coordination.

Operation

Run Efficiently from Day One

Ongoing support for maintenance, compliance, and utility management to ensure uninterrupted operations.

Start Building in 7 Months

At PIP, the journey from land registration to construction commencement is designed to be efficient, predictable, and seamless. With multiple processes running in parallel and a centralised support system in place, industries are enabled to begin construction within just seven months of executing the sale deed.

Sale Deed to start of Construction in 7 months
Application & Grant of TOR
1 month
EIA Study & Presentation
3 months
EC Recommendation & Grant
1 month
Consent to Establish
1 month
Building Plan Approvals
1 month
Industrial Power
2 months
Industrial Water
1 month
Gas Supply
3 months